Tower Bridge in London took about eight years to build, from 1886 to 1894.
Quick answer
- Construction started in 1886 and the bridge officially opened in 1894.
- That means it took roughly eight years to build Tower Bridge in London.
A bit of context
- Work began in April 1886 under engineer Sir John Wolfe Barry and architect Sir Horace Jones.
- Tower Bridge was formally opened on 30 June 1894 after years of complex foundation and structural work over the Thames.
Why it took so long
- The project needed massive foundations in the riverbed, including over 70,000 tons of concrete for the supporting piers.
- It was also a technically advanced bascule and suspension bridge for its time, requiring specialised engineering and thousands of tons of steel.