how long is the boneo scheme pipeline
I couldn’t verify a specific length for the “Boneo scheme pipeline” from the information available here, and the term may be referring to the Boneo water recycling plant upgrade or a related local works pipeline. The Boneo project sources I found discuss the upgrade itself, but not a clear pipeline length figure.
What I found
- The Boneo Water Recycling Plant Upgrade is described as a major wastewater treatment upgrade for the southern Mornington Peninsula, but the available summary does not state a pipeline length.
- A separate article mentions a Boneo Phase 4 wastewater treatment plant, again without giving a pipeline length in the accessible snippet.
- Because “Boneo scheme pipeline” is ambiguous, I can’t responsibly guess a number from these results.
Best next step
If you mean a specific Boneo project document, the exact pipeline length is likely in the technical plans, referral report, or engineering drawings rather than the public news writeups.
SORRY, FAILED